Preparing a site for paving: an overview

4 min readUpdated

A general overview of the stages involved in preparing ground for paving, and why the base layer matters.

Why preparation matters

What lies underneath a paved surface matters a great deal. Paving laid on poorly prepared ground can settle or move. This article gives a general overview only. Your paving contractor or designer will set the exact method for your site.

The usual stages

Paving projects generally follow these stages:

  • Set out and mark the area, and decide where water will drain to
  • Excavate to the depth the design requires and remove soft or organic material
  • Compact the ground that is left
  • Spread and compact a base layer, for which crusher run is commonly used
  • Add a levelling layer of bedding material
  • Lay the paving and finish the edges and joints

Depths and compaction

How deep each layer should be, and how it should be compacted, depends on the ground and on the loads the surface will carry. A home footpath and a heavy-vehicle yard are very different. Normlee does not give set depths in this article. Follow the advice of the person designing or installing the paving.

Ready to ask about an order? See the materials and published prices, read how delivery works, or use the contact details.

This guide gives general information only. It is not engineering or design advice, and it does not state a specification for any Normlee product. Follow the advice of your designer, engineer or contractor for your project.

Related guides

Questions about your order?

Ask us about materials, delivery and quantities for your project.